Topic · social
Recommissioning Marsden Point Power Sites
1 post
· 1 engagement
· first seen 4 May 2026
· last seen 4 May 2026
The post suggests reactivating Marsden Point power sites to meet electricity needs in the northern North Island, emphasizing energy reliability and infrastructure efficiency.
Platform mix
Where the conversation is happening. Engagement is volume-weighted (likes + 2×shares + 3×replies); a small number of high-impact posts can outrank a high-volume but low-engagement platform.
-
youtube
1 post
· 1 engagement
1
Top posts by engagement
The most-engaged posts referencing this topic. Engagement is likes + 2×shares + 3×replies; the order matches the digest ranking on /social.
-
youtube
· @UCEvij8tml0J44DSob4cFmzw
· reply
· sentiment: positive
· ♥ 1
· ↻ 0
· 💬 0
· 1 engagement
4 May