OpenBrief
Log in Sign up
What the picker changes
  • Top topics digest — the cards score the selected period against the prior 4 weeks.
  • 12-week heatmap & outlet matrix — show the 12 weeks ending at the selected week (they slide back with the picker, they aren’t a fixed snapshot).
  • Per-topic volume / alias drift — same 12-week trailing window, anchored on the selected period.
  • Coverage gap quadrant — scores the selected period against the 12 weeks before it (not including it).
  • Anomaly cards — only show alerts the detector fired during the selected period. Quiet weeks legitimately show none.
What stays as-is
  • Outlet orientation strip / lean colours — context-only, drawn from the last 12 weeks of activity regardless.
  • Co-occurrence graph — recent-activity anchored, not picker-driven.
  • Source & topic profiles — all-time data for the topic; the picker doesn’t affect them.
Rolling 7 days is a sliding live window for “current vibes”; switch to Weekly to compare specific weeks side-by-side.
live window
Topic · social

Light Rail Cost Overruns

2 posts · 34 engagement · first seen 15 May 2026 · last seen 15 Jun 2026

The post criticizes the high cost of New Zealand's light rail project, comparing it to India's airport construction and accusing it of inflated consultancy fees disguised as legitimate expenses.

Platform mix

Where the conversation is happening. Engagement is volume-weighted (likes + 2×shares + 3×replies); a small number of high-impact posts can outrank a high-volume but low-engagement platform.

  • twitter
    1 post · 31 engagement
    31
  • youtube
    1 post · 3 engagement
    3

Top posts by engagement

The most-engaged posts referencing this topic. Engagement is likes + 2×shares + 3×replies; the order matches the digest ranking on /social.