Topic · social
Level Crossing Replacement
2 posts
· 210 engagement
· first seen 23 Jul 2026
· last seen 6 Aug 2026
Level crossing replacement is the programme of removing or upgrading rail level crossings, often with bridges or underpasses, to improve safety and traffic flow, particularly in Auckland as part of the City Rail Link project.
Platform mix
Where the conversation is happening. Engagement is volume-weighted (likes + 2×shares + 3×replies); a small number of high-impact posts can outrank a high-volume but low-engagement platform.
-
reddit
1 post
· 141 engagement
141
-
twitter
1 post
· 69 engagement
69
Top posts by engagement
The most-engaged posts referencing this topic. Engagement is likes + 2×shares + 3×replies; the order matches the digest ranking on /social.
-
reddit
· u/MontyPascoe
· sentiment: positive
· ♥ 24
· ↻ 0
· 💬 39
· 141 engagement
6 Aug
-
twitter
· @cjsbishop
· sentiment: positive
· ♥ 44
· ↻ 2
· 💬 7
· 69 engagement
23 Jul