Topic · social
Government Project Delay
9 posts
· 1,351 engagement
· first seen 15 Nov 2019
· last seen 6 Jun 2026
The New Zealand government's plan to build a liquefied natural gas import terminal in Taranaki to lower electricity prices is facing uncertainty due to pending decisions on design and construction.
Stance breakdown
How the per-edge framings classify across 6 classified edges. Each framing is labelled by a small AI stance classifier; see the methodology page for details.
Sentiment breakdown
Whole-post emotional valence across 6 classified posts that reference this topic. Distinct from stance: a post can be supportive of the topic and still negative in tone (an angry supporter) — the two together capture the texture short-form posts compress into very few words.
Positive
2
Neutral
1
Negative
3
Platform mix
Where the conversation is happening. Engagement is volume-weighted (likes + 2×shares + 3×replies); a small number of high-impact posts can outrank a high-volume but low-engagement platform.
-
twitter
1 post
· 538 engagement
538
-
reddit
1 post
· 228 engagement
228
-
youtube
4 posts
· 32 engagement
32
Top posts by engagement
The most-engaged posts referencing this topic. Engagement is likes + 2×shares + 3×replies; the order matches the digest ranking on /social.
-
twitter
· @actparty
· sentiment: positive
· ♥ 336
· ↻ 38
· 💬 42
· 538 engagement
14 Apr
-
reddit
· u/Bealzebubbles
· sentiment: neutral
· ♥ 90
· ↻ 0
· 💬 46
· 228 engagement
20 May
-
youtube
· @UCWuArDYdMZYF-eLu5Bd4i6Q
· reply
· sentiment: positive
· ♥ 26
· ↻ 0
· 💬 0
· 26 engagement
4 Jun
-
youtube
· @UC1ffS2e6CEoH6k185XSjRDw
· reply
· sentiment: negative
· ♥ 5
· ↻ 0
· 💬 0
· 5 engagement
6 Jun
-
youtube
· @UCP-dlBpu6anJlAD39c4PcSQ
· reply
· sentiment: negative
· ♥ 1
· ↻ 0
· 💬 0
· 1 engagement
27 May
-
youtube
· @UCRoTOqAIivUXCFea6pdBKrQ
· reply
· sentiment: negative
· ♥ 0
· ↻ 0
· 💬 0
· 0 engagement
2 Jun