OpenBrief
Log in Sign up
What the picker changes
  • Top topics digest — the cards score the selected period against the prior 4 weeks.
  • 12-week heatmap & outlet matrix — show the 12 weeks ending at the selected week (they slide back with the picker, they aren’t a fixed snapshot).
  • Per-topic volume / alias drift — same 12-week trailing window, anchored on the selected period.
  • Coverage gap quadrant — scores the selected period against the 12 weeks before it (not including it).
  • Anomaly cards — only show alerts the detector fired during the selected period. Quiet weeks legitimately show none.
What stays as-is
  • Outlet orientation strip / lean colours — context-only, drawn from the last 12 weeks of activity regardless.
  • Co-occurrence graph — recent-activity anchored, not picker-driven.
  • Source & topic profiles — all-time data for the topic; the picker doesn’t affect them.
Rolling 7 days is a sliding live window for “current vibes”; switch to Weekly to compare specific weeks side-by-side.
live window
Topic · social

Cost Overruns In Māori Health Policies

1 post · 5 engagement · first seen 16 Aug 2026 · last seen 16 Aug 2026

high financial costs associated with culturally specific practices that do not address clinical health needs

Platform mix

Where the conversation is happening. Engagement is volume-weighted (likes + 2×shares + 3×replies); a small number of high-impact posts can outrank a high-volume but low-engagement platform.

  • youtube
    1 post · 5 engagement
    5

Top posts by engagement

The most-engaged posts referencing this topic. Engagement is likes + 2×shares + 3×replies; the order matches the digest ranking on /social.