Topic · social
Aqua Hydro Project Delay
1 post
· 2 engagement
· first seen 15 Sep 2026
· last seen 15 Sep 2026
a proposed hydroelectric project on the lower Waitaki River that was abandoned due to regulatory delays and cost concerns
Platform mix
Where the conversation is happening. Engagement is volume-weighted (likes + 2×shares + 3×replies); a small number of high-impact posts can outrank a high-volume but low-engagement platform.
-
youtube
1 post
· 2 engagement
2
Top posts by engagement
The most-engaged posts referencing this topic. Engagement is likes + 2×shares + 3×replies; the order matches the digest ranking on /social.
-
youtube
· @UCOJhr1jcSB8Ku5yfqvfQ4Lg
· reply
· sentiment: negative
· ♥ 2
· ↻ 0
· 💬 0
· 2 engagement
15 Sep