The New Zealand government has committed to a full post-completion review of the $5.5 billion City Rail Link after its former leader, Sean Sweeney, argued that the project was over-engineered and could have been delivered at half the cost with simpler, more cost-effective designs
Stacked weekly counts; colour by editorial lean. Stuff and The Spinoff lean centre-left, NZ Herald centre-right, others centre.
How press outlets have named this topic, week by week.
Most recent 2 articles linking to this topic.
Up to 12 framings spread across outlets. Each framing is the LLM's one-line characterisation of the article's editorial angle — not a quote.
tunnelling technology is now cheaper and safer
Govt pledges CRL review after former boss says it could have cost lesshigh expense and urban disruption concerns
Nzta to discuss investment in second mt victoria tunnel for wellington at board meetingSpotted something wrong on this page? Report a correction.