OpenBrief
Log in Sign up
What the picker changes
  • Top topics digest — the cards score the selected period against the prior 4 weeks.
  • 12-week heatmap & outlet matrix — show the 12 weeks ending at the selected week (they slide back with the picker, they aren’t a fixed snapshot).
  • Per-topic volume / alias drift — same 12-week trailing window, anchored on the selected period.
  • Coverage gap quadrant — scores the selected period against the 12 weeks before it (not including it).
  • Anomaly cards — only show alerts the detector fired during the selected period. Quiet weeks legitimately show none.
What stays as-is
  • Outlet orientation strip / lean colours — context-only, drawn from the last 12 weeks of activity regardless.
  • Co-occurrence graph — recent-activity anchored, not picker-driven.
  • Source & topic profiles — all-time data for the topic; the picker doesn’t affect them.
Rolling 7 days is a sliding live window for “current vibes”; switch to Weekly to compare specific weeks side-by-side.
live window
Press topic

Rail Link Project Delays

3 articles · 3 aliases in press · peaked week of 10 May 2026 · first seen 9 May 2026

A podcast discussion on the potential reform of the Superannuation age, focusing on life expectancy-based eligibility, racial disparities in pension access, and the need for urgent investment in electricity and infrastructure projects.

Coverage by outlet lean Methodology →

Stacked weekly counts; colour by editorial lean. Stuff and The Spinoff lean centre-left, NZ Herald centre-right, others centre.

Alias drift

How press outlets have named this topic, week by week.

Free account Create a free account to watch this topic — get alerted when framing shifts, when an MP adopts new language, or when discourse and press diverge. Create a free account Log in

Recent headlines

Most recent 3 articles linking to this topic.

Sample framings

Up to 12 framings spread across outlets. Each framing is the LLM's one-line characterisation of the article's editorial angle — not a quote.

tvnz Centre

key infrastructure plans at risk of slowdown

Fuel price surge hits transport fund, project delays feared
13 May
rnz Centre

infrastructure bottlenecks undermining development

Is auckland really the city of fails or does it just have a cashflow problem
19 Aug
Free account Create a free account to see every framing on this topic — plus alerts when framing shifts or an MP adopts new language. Create a free account Log in

How the public reacted

Social-media signal on the same topic, drawn from the social lens. Engagement is likes + 2×shares + 3×replies, the same weighting used across the digest cards. View on /social →

Spotted something wrong on this page? Report a correction.