the number of backup generators required for a data center has been reduced to under 34, down from 84 in original plans
Up to 12 framings across outlets and orientations — each a short phrase the extractor generated to characterise the piece's editorial angle (not a quote). Filter by lean to see how each bloc is spinning the story; click through to read the original.
public skepticism over reduced backup power claims
Southlanders not buying Datagrid's promises of scaled-back AI factorycutting down on emergency power needs
Datagrid pledges less water, generator use at Southland AI factoryStacked weekly counts; colour by editorial lean. Stuff and The Spinoff lean centre-left, NZ Herald centre-right, others centre.
How press outlets have named this topic, week by week.
Most recent 3 articles linking to this topic.
Spotted something wrong on this page? Report a correction.