A major power outage at a Kaikohe substation, caused by a catastrophic switchboard failure, has been repaired, with Top Energy implementing long-term resilience measures and facing a regulatory investigation.
Stacked weekly counts; colour by editorial lean. Stuff and The Spinoff lean centre-left, NZ Herald centre-right, others centre.
How press outlets have named this topic, week by week.
Most recent 2 articles linking to this topic.
Up to 12 framings spread across outlets. Each framing is the LLM's one-line characterisation of the article's editorial angle — not a quote.
replacement sourced from ngāwhā geothermal plant
Far north substation repaired after major power outagesustainable clean energy sourcing
Tnue slow-release urea factory opens at He Ahi eco-park near TaupōSpotted something wrong on this page? Report a correction.