Amazon has abandoned its planned West Auckland data centre, recording a $45 million impairment and shifting to a lease-and-equip model in New Zealand, amid reduced investments in construction and increased spending on existing infrastructure.
Stacked weekly counts; colour by editorial lean. Stuff and The Spinoff lean centre-left, NZ Herald centre-right, others centre.
How press outlets have named this topic, week by week.
Most recent 3 articles linking to this topic.
Up to 12 framings spread across outlets. Each framing is the LLM's one-line characterisation of the article's editorial angle — not a quote.
secondary location in global digital infrastructure race
CDC signs deal to build 555-megawatt data centrehigh financial risk in greenfield tech projects
Amazon takes $45m hit, abandons planned West Auckland data centreSocial-media signal on the same topic, drawn from the social lens. Engagement is likes + 2×shares + 3×replies, the same weighting used across the digest cards. View on /social →
Spotted something wrong on this page? Report a correction.