The long-delayed International Convention Centre in Auckland has been formally handed over to SkyCity after years of delays, cost overruns, and a major 2019 fire, which triggered legal action and safety concerns.
Stacked weekly counts; colour by editorial lean. Stuff and The Spinoff lean centre-left, NZ Herald centre-right, others centre.
How press outlets have named this topic, week by week.
Most recent 12 articles linking to this topic.
Up to 12 framings spread across outlets. Each framing is the LLM's one-line characterisation of the article's editorial angle — not a quote.
waste of over $30 million
Heads could roll at Immigration NZ as Public Service Commissioner investigates integritymassive financial waste without return
Immigration officials ‘deliberately withheld’ information on failed $30m tech upgradeSocial-media signal on the same topic, drawn from the social lens. Engagement is likes + 2×shares + 3×replies, the same weighting used across the digest cards. View on /social →
Spotted something wrong on this page? Report a correction.