a significant increase in estimated costs from $296 million to $419 million for the original project
Up to 12 framings across outlets and orientations — each a short phrase the extractor generated to characterise the piece's editorial angle (not a quote). Filter by lean to see how each bloc is spinning the story; click through to read the original.
budget explosion from initial planning to revised estimate
Watch: Green light for Wellington Kāinga Ora project at one third of original sizeStacked weekly counts; colour by editorial lean. Stuff and The Spinoff lean centre-left, NZ Herald centre-right, others centre.
How press outlets have named this topic, week by week.
Most recent 1 articles linking to this topic.
Spotted something wrong on this page? Report a correction.