OpenBrief
Log in Sign up
What the picker changes
  • Top topics digest — the cards score the selected period against the prior 4 weeks.
  • 12-week heatmap & outlet matrix — show the 12 weeks ending at the selected week (they slide back with the picker, they aren’t a fixed snapshot).
  • Per-topic volume / alias drift — same 12-week trailing window, anchored on the selected period.
  • Coverage gap quadrant — scores the selected period against the 12 weeks before it (not including it).
  • Anomaly cards — only show alerts the detector fired during the selected period. Quiet weeks legitimately show none.
What stays as-is
  • Outlet orientation strip / lean colours — context-only, drawn from the last 12 weeks of activity regardless.
  • Co-occurrence graph — recent-activity anchored, not picker-driven.
  • Source & topic profiles — all-time data for the topic; the picker doesn’t affect them.
Rolling 7 days is a sliding live window for “current vibes”; switch to Weekly to compare specific weeks side-by-side.
live window
Topic

Waiouru Housing Project Delay

3 items · 2 aliases · first seen 19 May 2026

The New Zealand government has officially begun the largest defence housing project in decades, with construction starting on 13 homes in Manawatū and plans for 61 more at Devonport, while broader upgrades to barracks and housing across nine sites are underway.

Volume by source orientation Methodology →

Stacked weekly counts; colour by lean. “n/a” covers government and iwi-Māori sources where lean isn't applicable.

Alias drift

How this topic has been named, week by week. A new alias winning out is usually a framing shift.

Free account Watch this topic with a free account — get alerted when framing shifts, when an MP adopts new language, or when discourse and press diverge. Create a free account Log in

In the press Methodology →

How the news corpus has covered this same topic over the last 12 weeks. 1 article from RNZ, Stuff, NZ Herald, ODT, 1News, Newsroom and The Spinoff. Click through to the press view for the full panel.

12-week press volume 1 article
Free account Create a free account to see every headline on this topic — plus alerts when framing shifts or discourse and press diverge. Create a free account Log in

Sample framings

Up to 12 framings spread across orientations. Each framing is a short phrase the topic extractor generated to characterise the piece's stance — not a quote from the source. Click through to read the original.

No framings recorded for this topic yet.

Spotted something wrong on this page? Report a correction.