OpenBrief
Log in Sign up
What the picker changes
  • Top topics digest — the cards score the selected period against the prior 4 weeks.
  • 12-week heatmap & outlet matrix — show the 12 weeks ending at the selected week (they slide back with the picker, they aren’t a fixed snapshot).
  • Per-topic volume / alias drift — same 12-week trailing window, anchored on the selected period.
  • Coverage gap quadrant — scores the selected period against the 12 weeks before it (not including it).
  • Anomaly cards — only show alerts the detector fired during the selected period. Quiet weeks legitimately show none.
What stays as-is
  • Outlet orientation strip / lean colours — context-only, drawn from the last 12 weeks of activity regardless.
  • Co-occurrence graph — recent-activity anchored, not picker-driven.
  • Source & topic profiles — all-time data for the topic; the picker doesn’t affect them.
Rolling 7 days is a sliding live window for “current vibes”; switch to Weekly to compare specific weeks side-by-side.
live window
Topic

Staffing Cost Overruns

4 items · 4 aliases · peaked week of 3 May 2026 · first seen 4 May 2026

The Taxpayers’ Union reports that Northland councils face significant financial pressures despite low apparent rate differences, highlighting issues like debt, high staffing and outsourcing costs, and inefficient administration, and calls for an immediate rates cap.

Stance breakdown Methodology →

How the framings classify across 3 articles. Each framing is labelled by a small AI stance classifier; see the methodology page for details.

100%
Critical 3

Volume by source orientation Methodology →

Stacked weekly counts; colour by lean. “n/a” covers government and iwi-Māori sources where lean isn't applicable.

Alias drift

How this topic has been named, week by week. A new alias winning out is usually a framing shift.

Free account Watch this topic with a free account — get alerted when framing shifts, when an MP adopts new language, or when discourse and press diverge. Create a free account Log in

Sample framings

Up to 12 framings spread across orientations. Each framing is a short phrase the topic extractor generated to characterise the piece's stance — not a quote from the source. Click through to read the original.

millions wasted on unnecessary digital project

Councillors Duped Into Thinking $7.7 Million Website Was an App
3 Jun

outsourcing and bureaucracy inflate expenses

Taxpayers' Union Launches 2026 Ratepayers' Report for Northland Councils
3 May
Free account Create a free account to unlock the full set here — plus alerts when framing shifts or an MP adopts new language. Create a free account Log in

Spotted something wrong on this page? Report a correction.