A long-delayed hydroelectric project in the Waitaha Valley on the West Coast receives fast-tracked consent, promising energy resilience, job creation, and emissions reductions after 20 years of setbacks and reconsideration.
Stacked weekly counts; colour by lean. “n/a” covers government and iwi-Māori sources where lean isn't applicable.
How this topic has been named, week by week. A new alias winning out is usually a framing shift.
Verbatim segments from politicians speaking on podcasts and radio shows about this topic. Sourced via the voice-reference library — each speaker has been confirmed manually from their voice clip. Click play to stream the original audio from the publisher, pre-seeked to the moment the quote starts.
That requires us to put in place an energy strategy that makes sense and is coherent. We're not gonna do the mistake that the Labour Greens government did where you created $800 megawatt power prices and low and middle income working people lost their jobs. Unacceptable.
Up to 12 framings spread across orientations. Each framing is a short phrase the topic extractor generated to characterise the piece's stance — not a quote from the source. Click through to read the original.
blame on corporate profits and poor affordability
Barry Soper: Newstalk ZB senior political correspondent on the coalition looking likely to lead according to new pollenvironmental groups oppose all projects despite advocating renewables
After 20 years, a hydro dam gets consentedSocial-media signal on the same topic, drawn from the social lens. Engagement is likes + 2×shares + 3×replies, the same weighting used across the digest cards. View on /social →
Spotted something wrong on this page? Report a correction.