OpenBrief
Log in Sign up
What the picker changes
  • Top topics digest — the cards score the selected period against the prior 4 weeks.
  • 12-week heatmap & outlet matrix — show the 12 weeks ending at the selected week (they slide back with the picker, they aren’t a fixed snapshot).
  • Per-topic volume / alias drift — same 12-week trailing window, anchored on the selected period.
  • Coverage gap quadrant — scores the selected period against the 12 weeks before it (not including it).
  • Anomaly cards — only show alerts the detector fired during the selected period. Quiet weeks legitimately show none.
What stays as-is
  • Outlet orientation strip / lean colours — context-only, drawn from the last 12 weeks of activity regardless.
  • Co-occurrence graph — recent-activity anchored, not picker-driven.
  • Source & topic profiles — all-time data for the topic; the picker doesn’t affect them.
Rolling 7 days is a sliding live window for “current vibes”; switch to Weekly to compare specific weeks side-by-side.
live window
Topic

Cost Overruns In Ferry Contracts

9 items · 7 aliases · peaked week of 26 Apr 2026 · first seen 29 Apr 2026

The Labour government is criticized for failing to deliver a ferry replacement plan, cancelling rail-enabled ferry orders, causing significant financial losses and prolonged delays for New Zealanders.

Stance breakdown Methodology →

How the framings classify across 3 articles. Each framing is labelled by a small AI stance classifier; see the methodology page for details.

100%
Critical 3

Volume by source orientation Methodology →

Stacked weekly counts; colour by lean. “n/a” covers government and iwi-Māori sources where lean isn't applicable.

Alias drift

How this topic has been named, week by week. A new alias winning out is usually a framing shift.

Free account Watch this topic with a free account — get alerted when framing shifts, when an MP adopts new language, or when discourse and press diverge. Create a free account Log in

In the press Methodology →

How the news corpus has covered this same topic over the last 12 weeks. 1 article from RNZ, Stuff, NZ Herald, ODT, 1News, Newsroom and The Spinoff. Click through to the press view for the full panel.

12-week press volume 1 article
Free account Create a free account to see every headline on this topic — plus alerts when framing shifts or discourse and press diverge. Create a free account Log in

Sample framings

Up to 12 framings spread across orientations. Each framing is a short phrase the topic extractor generated to characterise the piece's stance — not a quote from the source. Click through to read the original.

rising financial burden on public

Release: Government breaks promise on ferry plan
28 Apr

economic burden from policy reversals

Release: Nicola Willis’ smaller ferries will cost more
28 Apr
Free account Create a free account to unlock the full set here — plus alerts when framing shifts or an MP adopts new language. Create a free account Log in

How the public reacted

Social-media signal on the same topic, drawn from the social lens. Engagement is likes + 2×shares + 3×replies, the same weighting used across the digest cards. View on /social →

Spotted something wrong on this page? Report a correction.