The City Rail Link topic covers the construction, progress, and infrastructure impact of Auckland's underground rail tunnel project, including debates about its future-proofing, integration with the wider transport network, and the opportunities and disruptions it presents for the city.
How the framings classify across 7 articles. Each framing is labelled by a small AI stance classifier; see the methodology page for details.
Up to 12 framings across outlets and orientations — each a short phrase the extractor generated to characterise the piece's editorial angle (not a quote). Filter by lean to see how each bloc is spinning the story; click through to read the original.
builds on successful infrastructure momentum
\\ \\ 30 Sep 2026Chris Bishop\\ \\ **New era begins for Auckland’s transport system** \\ \\ New era begins for Auckland’s transport system Auckland’s new transport governance, planning and delivery arrangements will be in effect from tomorrow, restoring democratic accountability and resetting\\ \\ Read moreStacked weekly counts; colour by lean. “n/a” covers government and iwi-Māori sources where lean isn't applicable.
How this topic has been named, week by week. A new alias winning out is usually a framing shift.
How the news corpus has covered this same topic over the last 12 weeks. 5 articles from RNZ, Stuff, NZ Herald, ODT, 1News, Newsroom and The Spinoff. Click through to the press view for the full panel.
Social-media signal on the same topic, drawn from the social lens. Engagement is likes + 2×shares + 3×replies, the same weighting used across the digest cards. View on /social →
Spotted something wrong on this page? Report a correction.