a significant increase in estimated costs from $296 million to $419 million for the original project
Up to 12 framings across outlets and orientations — each a short phrase the extractor generated to characterise the piece's editorial angle (not a quote). Filter by lean to see how each bloc is spinning the story; click through to read the original.
Stacked weekly counts; colour by lean. “n/a” covers government and iwi-Māori sources where lean isn't applicable.
How this topic has been named, week by week. A new alias winning out is usually a framing shift.
How the news corpus has covered this same topic over the last 12 weeks. 1 article from RNZ, Stuff, NZ Herald, ODT, 1News, Newsroom and The Spinoff. Click through to the press view for the full panel.
Spotted something wrong on this page? Report a correction.