The opening of the Te Ara Tupua cycleway in Wellington, while praised by users, has sparked debate over its high cost, with 75% of the $348 million budget allocated to resilience work, raising concerns about funding priorities and the sustainability of active transport projects.
Stacked weekly counts; colour by lean. “n/a” covers government and iwi-Māori sources where lean isn't applicable.
How this topic has been named, week by week. A new alias winning out is usually a framing shift.
How the news corpus has covered this same topic over the last 12 weeks. 1 article from RNZ, Stuff, NZ Herald, ODT, 1News, Newsroom and The Spinoff. Click through to the press view for the full panel.
Up to 12 framings spread across orientations. Each framing is a short phrase the topic extractor generated to characterise the piece's stance — not a quote from the source. Click through to read the original.
Spotted something wrong on this page? Report a correction.